I was asked by several newsletter readers after last week’s article about water usage in Nebraska to provide similar information about energy usage in our state. The amount of energy data centers use was of particular interest. The answer to how much energy our communities, industries, including data centers use is that it depends on the specifics of each facility or location. Before I delve further into that, I want to define a few important terms. 

A megawatt (MW) is a common term used to describe electrical capacity. A MW is a million watts or a thousand kilowatts (kW). A megawatt-hour (MWh) measures the amount of energy consumed over time. Using the analogy of water flowing through a pipe to describe the difference between capacity and energy consider this graphic:

For purposes of this newsletter we will talk about MW of peak demand, or the maximum amount of power utilized over a specific time frame. This measures the highest electrical power used by a power system or customer.

Below is a chart that shares MW of peak demand for various electrical systems and/or users. For reference, Nebraska’s combined peak demand capacity is nearly 11,000 MW. The actual highest combined peak demand is currently around 7,000 MW.

Community/Utility/FacilityPeak DemandNotes
Nebraska Public Power District (NPPD)3087.8 MWAs of Dec. 31, 2025
Omaha Public Power District (OPPD)2979.5 MWAs of Dec. 31, 2025
AI Data Center500-1,000+ MWHyperscale AI
Lincoln Electrical System (LES)819 MWAs of Dec. 31, 2025
Large industrial facility10-500+ MWSteel mill/electric arc furnace.
Large Data Center20-100 MWMainly for cloud computing, data storage.
City of Hastings100.7 MWReached on July 1, 2005
Large Commercial Facility1-20 MWOffice space, hospital, university building, mall
City of Seward24 MWSummer 2026
Grocery Store0.2-1.5 MW
Restaurant50-500 kW
Small retail store10-100 kWLocal grocery store/restaurant
Single Family Home3-10 kW
Apartment Unit1-5 kW

*Many large scale AI data centers using 1,000+ MW of power have been proposed and/or planned but to-date few have been built and are operational in the United States.

To provide additional perspective, consider the peak energy usage of several of the facilities listed above, in terms of equivalent homes in the chart below:

Facility TypeEquivalent Homes (~5 kW)
AI Hyperscale Data Center (250 MW)~50,000 homes
Large Industrial Facility (100 MW)~20,000 homes
Large Data Center Facility (50 MW)~10,000 homes
Large Manufacturing Facility (25 MW)~5,000 homes
Grocery Store (500 kW)~100 homes
Restaurant (100 kW)~20 homes
Small Retail Store (25 kw)5 homes

We will have more information about existing, new and proposed data centers usage of electricity and water from the recent passage of LB1111, which requires them to annually report this information publicly.  There are a lot of considerations to take into account for any proposed facility that would utilize a significant amount of energy. One advantage Nebraska has over other states is that we are a state with 100% public power, which is tasked with minimizing the impacts on rate-payers and ensuring adequate capacity vs. publicly-traded utilities who are beholden to shareholders.

For additional reading on how public power is meeting all forecasted summer demand requirements through 2044 with existing, committed, planned, and studied resources check out this report (specifically pages 32-33 for summer peak demand and pages 38-39 for winter peak demand).


As always, if I can be of assistance to you in any way, please do not hesitate to contact my office. My staff members – Matt and Katie – are available to assist you with your needs and they pass along messages, so if you’d like a call back, please let them know! 

Email: jana.hughes@leg.ne.gov

Phone: 402-471-2756

Facebook: Senator Jana Hughes